Major Projects 1

SL NO.
JOB DESCRIPTION
VALUE IN R.O.
TENDER NO.
CLIENT
YEAR
1
ENGINEERING,PROCUREMENT AND CONSTRUCTION OF 11/33KV SYSTEM FOR POWER PLANT AT DUQUM AREA IN AL-WUSTA REGION
2,826,391.211
169/08
RAECO
2009
2
EPC FOR UPGRADING SHAAB ASEEB POWER STATION IN DHOFAR GOVERNORATE
2,751,315.000
11/2009
RAECO
2009
3
REPLACEMENT OF DISTRIBUTION CABLES
1,899,011.090
GTC/130/21
Qatar General Electricity & Water Corporation
2006
4
LIVE LINE WASHING AND HAND CLEANING OF 220KV OVERHEAD TRANSMISSION LINE INSULATORS AND GRID STATION OUTDOOR GANTRIES IN OETC TRANSMISION NETWORK
17,74,872.000
TB 25/2011
OETC
2011
5
CONSTRUCTION OF 33KV LINE (2NOS.) WITH 2 X 20 MVA PRIMARY S/S TO THE SPORTS BEACH CITY IN AL-MUSNAH SOUTH BATINAH REGION
1,646,579.000
98/2009
MAZOON
2009
6
DISTRIBUTION OF OVERHEAD LINE CONSTRUCTION WORKS
16,31,530.840
GTC/105/20
Qatar General Electricity & Water Corporation
2006
7
NEW 33KV FEEDERS ( DIL – 1 & 2, MUKHALIF – 2) AT SAHAM GRID STATION
1,520,200.000
357/2010
MAJAN
2010
8
ADDITIONAL GENERATION AT MADHA POWER STATION IN MUSANDAM GOVERNORATE
1,166,025.000
147/2010
RAECO
2010
9
CONSTRUCTION OF 33KV FEEDERS FROM SUMAIL GRID SUB STATION TO PROPOSED 2X20MVA SUBSTATION FOR THE NEW CERNTRAL PRISON AT SUMAIL IN AL DHAKHLIYA REGION
1,024,947.300
44/2007
MAZOON
2007
10
ELECTRICAL EMERGENCY AND MAINTENANCE SERVICES OF 33KV, 11KV AND LV NETWORKS AT HAIMA, ABU MUDHABI, AL AJAIZ, AL GHOUBRAH NORTH & SOUTH, HITAM, AL KAHAL, AL LAKBI AND SOWQRAH AREAS IN AL WUSTA GOVERNORATE (GROUP 3)
9,99,972.000
51/2014
RAECO
2014
11
EXTENSION OF 33KV LINE FROM THE PROPOSED 33KV GANTRY STATION TO AL-DAHAR AND RAS MADRAKAH AND CONSTRUCTION OF (2X1MVA – 33/11KV) PRIMARY SUBSTATION AT AL-DAHAR & (2X3MVA – 33/11KV) PRIMARY SUBSTATION AT RAS MADRAKAH – TO CLOSE DOWN RAS MADRAKAH POWER STATION IN AL WUSTA GOVERNORATE
7,35,950.000
25/2013
RAECO
2013
12
UPGRADING OF RUMAIS S/S FROM 4 X 6 MVA TO 2 X 20MVA AT BARKA IN SOUTH BATINAH REGION
664,768.500
105/2009
MAZOON
2009